Landfill Scale Ticket Reconciliation & Automated Tonnage Overage Billing
Landfill Scale Ticket Reconciliation & Automated Tonnage Overage Billing
Roll-off scale ticket software reconciles transfer station weight slips against a customer’s included container tonnage allowance to eliminate unbilled disposal overages.
In RollOS Tonnage Billing, small and mid-size haulers (1 to 25+ trucks) automate post-pickup overage calculations and settle excess weight and rental-day extensions directly against the customer’s vaulted Stripe card on file. Return to the main dumpster rental management software documentation hub.
Overage Settlement Formula & Calculation Logic
When a driver completes a pickup and logs the landfill scale house ticket via their 1-Tap SMS Magic Link, RollOS computes the final settlement invoice using the following deterministic formula:
Net Debris Weight (Tons) = Gross Truck Weight (Tons) - Tare Weight (Tons)
Billable Overage Tons = MAX(0, Net Debris Weight - Included Tonnage Allowance)
Tonnage Overage Charge = Billable Overage Tons × Contractual Per-Ton Overage Rate ($/Ton)
Billable Extra Days = MAX(0, Total Days On Site - Included Rental Days)
Extension Charge = Billable Extra Days × Daily Extension Rate ($/Day)
Total Post-Pickup Charge = Tonnage Overage Charge + Extension Charge + Prohibited Item Fees
Haulers can generate itemized customer receipts using the built-in billing engine or reference the free Commercial Roll-Off Dumpster Invoice Template.
Standard C&D Material Density Reference Table
To help dispatchers and customers estimate container weight before a haul, the RollOS Tonnage & Overage Calculator uses standard construction and demolition (C&D) bulk density benchmarks:
| Debris Material Type | Average Weight per Cubic Yard (lbs/yd³) | Estimated 10-Yard Bin Weight (Tons) | Estimated 20-Yard Bin Weight (Tons) | Recommended Container Cap |
|---|---|---|---|---|
| Household Junk / Estate Cleanout | 250 – 350 lbs/yd³ | 1.25 – 1.75 Tons | 2.50 – 3.50 Tons | 10yd to 40yd |
| Mixed Construction & Demolition (C&D) | 400 – 600 lbs/yd³ | 2.00 – 3.00 Tons | 4.00 – 6.00 Tons | 10yd to 30yd |
| Asphaltingle Roofing Tear-Off | 700 – 850 lbs/yd³ | 3.50 – 4.25 Tons | 7.00 – 8.50 Tons | 10yd or 15yd (Weight-Limited) |
| Dry Dirt, Topsoil & Yard Fill | 1,800 – 2,200 lbs/yd³ | 9.00 – 11.00 Tons | Exceeds Single-Axle Legal Limit | 10yd Low-Boy (Half-Fill) |
| Broken Concrete, Brick & Asphalt | 2,400 – 4,000 lbs/yd³ | 12.00 – 20.00 Tons | Exceeds Hoist/Axle Limit | 10yd Heavy-Debris Can Only |
Related Technical Specifications
- Previous Specification: ← Zero-App Driver SMS Magic Link Routing & Proof-of-Service Protocol
- Next Specification: 2026 Waste Hauling Software TCO & Vendor Migration Matrix →
- External Resources: Google Sites Resource Hub · RollOS Reviews on G2